SeaDoo SP Manual de Serviço Página 188

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 187
Section 08 ELECTRICAL SYSTEM
Sub-Section 04 (STARTING SYSTEM)
08-04-7
Step Retaining brush holder with a screwdriver
Step Align here
Align end frame notch with brush holder notch /
yoke protrusion.
CAUTION : Make sure end frame fits per-
fectly on yoke.
STARTER INSTALLATION
Installation is essentially the reverse of removal
procedure. However, pay particular attention to
the following.
Make sure that starter and engine mating surfac-
es are free of debris. Serious trouble may arise if
starter is not properly aligned.
13,14, Screw
Torque starter screws to 22 N•m (16 lbf•ft).
15, Nut
Connect the RED battery cable to the starter and
torque nut to 6 N•m (53 lbf•in). Apply dielectric
grease on terminal and nut.
16,17, Screw and Teeth Washer
Apply Loctite 271 (red) on screw.
Connect BLACK cable to starter using flat washer,
teeth washer and screw. Torque screw to 22 N•m
(16 lbf•ft). Apply dielectric grease on terminal and
screw.
Step Torque nut to 6 N•m (53 lbf•in)
Step Apply Loctite 271 on screw
Step orque screw to 22 N•m (16 lbf•ft)
Step Apply dielectric grease
WARNING : Always connect RED positive
cable first then BLACK negative cable last.
Whenever connecting the RED positive cable
to the starter motor make sure the battery ca-
bles are disconnected to prevent electric
shock.
F01H0UA
2
1
1
2
-
F01HiJC
1 4
2
3
4
1
2
3
4
;
www.SeaDooManuals.net
Vista de página 187
1 2 ... 183 184 185 186 187 188 189 190 191 192 193 ... 315 316

Comentários a estes Manuais

Sem comentários